Centennial Library

Construction Manual

The City Council adopted the City of Grangeville Construction Specification Manual at the March 17, 2014 meeting.  All specifications are a work in progress.  Please verify with City Staff to make sure no changes have been made prior to completing the project.  If you have questions on the manual, please contact Public Works Director Bob Mager at 208-507-1737.

Construction Manual Detail Drawings – Cover thru 15

Construction Manual Detail Drawings – 16 thru 29

Construction Manual Detail Drawings – 30 thru 42

Construction Manual Detail Drawings – 43 thru 54

Construction Manual Detail Drawing – Lift Station

Construction Manual Detail Drawings – Pipe Trench Detail

 

Print Friendly, PDF & Email
Skip to content